RFID/CARIBE

Hotel credentials / 02

The hotel key, properly specified.

A familiar guest credential with recycled-PVC, wood and paper-based fibre directions reviewed only after the property’s technical requirements are confirmed.

Start with your property
MaterialsRecycled PVC, wood or paper fibre
EdgeCR80 / construction confirmed
FinishMatte, natural or printed

Decision framework

The artwork is visible. The technical decision underneath it matters more.

Card dimensions alone do not establish compatibility. The installed system, credential technology and encoding workflow must be confirmed before production.

Once the technical specification is stable, the card can be developed around brand colour, handling, presentation and any approved variable information.

Material image library / 15

Three materials.
Five views each.

Realistic image directions for comparison and artwork planning. Every final card construction, credential stack, material claim and operating limit remains subject to the approved specification and physical sample.

Request the product brief
MATERIAL / 01

Recycled PVC

A familiar plastic-card handling direction with visible recycled-content character. Recycled content, source and end-of-life language must be supported by the approved supplier specification.

MATERIAL / 02

Natural wood

A tactile natural-grain direction. Wood species, construction, surface treatment, card thickness and operating compatibility require a physical sample and documented approval.

MATERIAL / 03

Paper-based fibre

A compressed wood-pulp fibre direction for appropriately controlled programs. Fibre source, certification, recyclability, durability and operating limits remain document-dependent claims.

Three controls before release.

Each stage is reviewed separately so an attractive product direction never substitutes for technical or operational confirmation.

01

Material direction

Choose the card body around handling, budget and approved sustainability goals.

02

Print control

Review colour, finish, orientation and variable fields before release.

03

Proof before production

Approve a product-specific proof rather than relying on a screen mock-up alone.

Bring the system.
We will narrow the product.

Start with the property, use case, destination and what is known about the installed access environment.

Open the property brief